Mantis Bug Tracker

View Issue Details Jump to Notes ] Issue History ] Print ]
IDProjectCategoryView StatusDate SubmittedLast Update
0010272Dwarf FortressDwarf Mode -- Jobs, Assignment of Jobspublic2017-07-29 13:472017-07-29 14:15
ReporterDIMOHA25 
Assigned ToLoci 
PrioritylowSeverityminorReproducibilityhave not tried
StatusresolvedResolutionduplicate 
PlatformPCOSWindows 10OS Version
Product Version0.43.05 
Target VersionFixed in Version 
Summary0010272: Two jobs active in the same workshop at the same time
DescriptionHad two smiths try to work at the same time at my magma forge. Both tasks were on [n]/high priority/do task now!/whatever. One was ordered manually and one was ordered in the workshop profile. Tasks were different. Both tasks were marked as active in the workshop and both jobs were in fact active. The first smith worked as usual and the second one was walking around the workshop, trying to enter. (unable to enter from what I've seen)
Steps To ReproduceNo idea, but your best bet would be having a workshop order in place, but not active. Then manually adding an order and putting both on [n].
TagsNo tags attached.
Attached Files

- Relationships
duplicate of 0008805confirmedDwarfu Simultaneous stonecrafting and slab engraving jobs in craftsdwarf workshop 

-  Notes
There are no notes attached to this issue.

- Issue History
Date Modified Username Field Change
2017-07-29 13:47 DIMOHA25 New Issue
2017-07-29 14:15 Loci Relationship added duplicate of 0008805
2017-07-29 14:15 Loci Status new => resolved
2017-07-29 14:15 Loci Resolution open => duplicate
2017-07-29 14:15 Loci Assigned To => Loci


Copyright © 2000 - 2010 MantisBT Group
Powered by Mantis Bugtracker